(912) 233-3208 kimb@boaenmechanical.com

The Cay Building

Installed entire heating and air system for the 6 story Cay Building

    • 2 rooftop cooling towers
    • 5, 30 ton water source units on each floor
    • Complete installation of all duct work, piping and drains
    • VAV boxes with DDC control system
Skills

, , ,

Posted on

April 1, 2015